施工技术 2013年2月上 44 CONSTRUCTION TECHNOLOGY 第42卷第3期 D0I:10.7672/8gis2013030044 单层厂房预应力钢结构加固补强设计与施工 王永梅,周爱民,沙学勇 (浙江东南网架股份有限公司,浙江杭州311209) [摘要]因企业生产发展需要,某单层钢筋混凝土结构厂房内2台起重量为10、A4级工作制的吊车改为2台起重 量为20t、A5级工作制吊车,并要求最大限度在既有建筑使用面积内调整工艺生产流程,同时在加固补强施工期间 尽可能地不影响生产,并延长使用年限.通过对该厂房鉴定评估,就混凝土柱、混凝土梁及钢结构吊车梁进行预应 力钢结构加固补强设计与施工. [关键词]加固;钢结构;厂房;设计;施工 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2013)03-0044-05 Prestressed Steel Structure Strengthening Design and Construction of One-storey Workshop Wang Yongmei Zhou Aimin Sha Xueyong Zhejiang Southeast Lattice Frame Co.Lid.Hangzhou Zhejiang 311209 China) Abstract:Due to the development of business the lifting capacity of two cranes in a single-storey reinforced concrete need to be upgraded from 10T duty type A4 to 20T duty type A5 and the existing usable area of the building need to be maximized in alignment with the adjustment of production process. It was also required that the retrofitting work should try to avoid interruption to manufacturing and should extend the service life of the building.By site evaluation this paper made a detailed introduction to the strengthening design and construction of concrete columns concrete beams and steel crane beams. Key words:strengthening;steel structures;workshop;design;construction 1工程概况 骨 某单层钢筋混凝土结构厂房于1998年3月设 计,施工期间经过多次补充修改,于2000年下半年 -5 208 建成并投产使用. X010U GD512-52 GDUSi2-5sx GDLS12-5Z 地基和基础采用灌注桩和桩基承台;三连跨等 志 Z 高等跨预制装配式钢筋混凝土单层厂房,跨度为 DL-7Z 24m;边柱为矩形截面二阶柱,柱距为6m;中柱为格 DL- 7BXDL-T -7B 构式二阶柱,柱距为12m;柱顶标高13.300m 牛腿 a 000360...
推荐内容/By 图集吧
- 某高层钢结构建筑时变动力特性的实测分析 孙佳琦.pdf
- 中建科工《装配式钢结构住宅质量控制标准手册》.zip
- 某大楼拆除工程专项施工方案 2024年 160页.docx
- 24CJ76-2 单层防水卷材屋面保温建筑构造-PCR复合保温板.pdf
- 中建上海设计研究院《装配式钢结构住宅设计研究及产业化实践》课件.pdf
- 中建壹品《住宅项目结构设计限额指标(西部区域)》.pdf
- 中建三局《住宅工程土建深化设计》课件.pdf
- 中建八局四公司《住宅工程交房标准手册》.pdf
- 中建八局《住宅工程管道井施工工艺标准》.pdf
- 2024高层建筑智能化集成平台21p.docx
- 罗赤宇、陈星等-高层建筑大跨度拱架结构设计.pdf
- 罗建国、刘林林等-国家开发银行辽宁省分行营业用房项目超限高层结构设计.pdf