施工技术 2011年12月下 26 CONSTRUCTION TECHNOLOGY 第40卷第355期 北京国贸三期A阶段基坑支护设计与施工监测 马昕,周予启 (中建一局集团建设发展有限公司,北京100102) [摘要]北京国贸三期A阶段主塔楼建筑高度330m.基坑开挖深度-22.55m(最深-27.10m).根据地质条件, 大面采用上部土钉墙下部桩错联合的基坑支护结构形式,护坡桩间设高压旋喷形成止水帷幕体系.基坑施工过 程中,对支护结构水平位移、沉降、护坡桩倾斜、地下水位、锚杆拉力等进行监测.现场监测表明:围护结构和周边 环境的变形均在允许范围内,并针对监测结果提出改进措施. [关键词]地下工程;深基坑;桩错支护;监测 [中图分类号]TU470.3 [文献标识码]A [文章编号]1002-8498(2011)24-0026-04 Design and Construction Monitoring of Foundation Excavation Supporting in A Stage of Beijing World Trade Center Three Phase Ma Xin Zhou Yuqi China Construction First Division Group Construction Development Co.Lid.Beijing 100102 China) Abstract:The architectural height of A stage main building is 330m for the three phase project of Beijing World Trade Center.The depth of foundation excavation is -22.55m the deepest point is -27.10m). According to geological conditions soil nailing wall pounding with pile and anchors are designed as supporting structure and high-pressure jet grouting technology is adopted among the supporting piles to form waterproof curtain.During construction some control parameters are monitored including the ..horizontal displacement settlement inclining of supporting piles groundwater level and anchor stress. The monitoring results show that the displacement can meet the requirements and improving measures are suggested according to the monitoring values. Key words:underground;deep foundation excavation;pile-anchor supporting;monitoring 1工程概况 54和55层设8个2层高伸臂桁架形成结构转换 北京国贸三期A阶段工程坐落于北京市朝阳 层.周...
推荐内容/By 规范库
-
T/CCIAT 0064-2023 膨胀土地区建筑基坑支护技术规程.pdf
-
DB13(J) /T8625-2025 膨胀土地区建筑基坑支护技术标准.pdf
-
DB61/T 5037-2022 柔性面层基坑支护技术规程.pdf
-
T/CCES 38-2023 基坑倾斜桩无支撑支护技术规程.pdf
-
南通印象城基坑支护及土方开挖施工方案 .doc
-
中建灌注桩/冠梁/预应力锚索-基坑支护施工方案.doc
-
金凤区第二十五小学项目深基坑土方开挖、降水、支护专项施工方案.pdf
-
综合楼深基坑支护专项施工方案.pdf
-
T/CECS 1741-2024 深基坑永久支护结构技术规.pdf
-
学生宿舍项目土方开挖支护降水施工方案2025.pdf
-
医院项目土方开挖、降水及基坑支护专项方案.pdf
-
预应力-悬臂排桩组合支护结构空间变形的应用研究.pdf