施工技术 2010年6月 78 CONSTRUCTION TECHNOLOCY 第39卷第6期 布袋注浆桩施工技术改进 唐经华,邱敏 (武警水电第二总队,江西南昌330096) 【摘要]东南沿海某铁路软基处理工程,由于部分路基处于滨海冲积平原,因此在局部地段采用布袋注浆桩新技术 对淤泥土层加固.介绍布袋注浆桩发展现状、工艺原理、工艺特点、改进后的施工工艺.结果表明,采用改进后的 振动沉管法具有成本低、工效高和工序简单等优点.通过改进施工技术,简化了布袋注浆桩的工艺流程,提高了工 效,节省了工程投资. 【关键词]基础工程;布袋注浆桩;软基处理;技术改进 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2010)06-0078-02 Improvement on Construction Technology of Bag Grouting Pile Tang Jinghua Qiu min (No.2 Hydropower Force of Armed Police Nanchang Jiangxi 330096 China) Abstract:Based on soft foundation treatment of some railway in southeast coast area bag grouting pile is adopted in partial segment because partial roadbed locates in coastal alluvial plain.The development technology principles characteristics and improved technology of bag grouting pile are introduced.The results show that there are many advantages of low cost high performance simple process in improved vibration paction method.Besides after the construction technology is improved technology process of bag grouting pile is simplified and efficiency is enhanced which can save engineering cost. Key words:foundation engineering;bag grouting pile;soft foundation treatment;technical improvement 铁路路基工程施工中经常会遇到软土地基问题,1.2工艺原理 控制软土地区的地基沉降,就必须结合工程与环境条 布袋注浆桩工艺是以土工织物袋和注浆浆液形成 件,对不符合要求的软弱地基采取有效的加固处理措类似圆柱状硬化体来加固土体的软土地基处理工艺, 施,使工后沉降满足工程需要.软土地基处理有垫层是软土分层注浆技术和土工织物综合应用的新技术. 法、预压法、复合地基法、夯实法和灌浆法等常用方法.其方法是将浆液注人预先埋设于软土中的土工布袋 东南沿海某客运专线铁路部分路基处于滨海冲击中,形成直径为30~40cm的圆柱状或葫芦串状桩体, 平原,地基存在深厚软弱土层.在局部地段设计采用 注浆浆液由水、水泥和细砂、粉煤灰等掺和料组成....
布袋注浆桩施工技术改进.pdf
![东南沿海,滨海,高新区,学术文献](https://www.guifanku.com/wp-content/uploads/2023/12/thumb792800.jpg)