施工技术 2013年8月上 74 CONSTRUCTION TECHNOLOGY 第42卷第15期 D0:10.7672/8gj2013150074 冶金工业厂房屋架在不停产条件下加固技术研究 郑育新 (四川建筑职业技术学院土木工程系,四川德阳618000) [摘要]冶金工业厂房屋架出现安全隐患时,应进行加固处理,按以往常规方法,加固施工必须从地面往上搭设脚 手架,脚手架阻挡了车间内吊车的水平运行,迫使厂方停产加固,从而造成巨大的经济损失.采用预应力桁架式脚 手架技术,加固施工用脚手架不从地面上搭设,也不将脚手架荷载作用于有安全隐患的屋架上,施工期间不影响吊 车的正常运行,保证了厂方的正常生产. [关键词]加固;脚手架;预应力;施工技术;安全 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2013)15-0074-04 Research on Roof Truss Reinforcement of Metallurgical Factory Buildings Without Stop Manufacturing Zheng Yuxin Department of Ciwil Engineering Sichuan College of Architectural Technology Deyang Sichuan 618000 China) Abstract:The roof truss of metallurgical industry building should be reinforced in case of any potential safety hazard.The conventional method specifies that the scaffolds must be erected from the ground for the reinforcement construction resulting in that the scaffolds block the way of horizontal running of crane in the workshop and the manufacturer is pelled to suspend the production with subsequent enormous economic loss.However if using prestressing truss scaffold neither the scaffolds used for reinforcement will be erected from the ground nor scaffold load will be exerted on the roof truss with potential safety hazard through which the normal running of crane will not be influenced and further the normal production of the manufacturer can be guaranteed. Key words:reinforcement;scaffolds;prestressing;construction;safety 一些大型冶金工业企业的单层工业厂房跨度难题. 大,使用时间较长.以往屋架要进行加固,必须从1工程概况 地面上搭设施工脚手架,而施工脚手架必将阻止车 四川川投峨眉新银江铁合金有限责任公司一 间吊车梁上吊车的运行,且妨碍车间地面正常生 分厂7 8 9 10号炉厂房,因厂房建筑一次偶然的局 产,厂家只能停产进行加固施工,造成巨大的经济 部坍塌事故,屋架已出现许多影响结构安全的问 损失.不停产加固要求施工时脚手架不能从车间 题,勘察鉴定后发现因厂房已使用33年,且车间内 地面上搭设,也不能把脚手架支承于已有严重安全现场腐蚀性介质和高温影响,几乎屋架均已出 隐患的大跨度屋架上,这是一项特殊的技术难题.现顺筋裂缝,混凝土保护层爆裂脱落,钢筋锈蚀,许 为解决这一技术难题,保证加固施工期间厂家能正 多屋架腹杆四边混凝土保护层均爆裂脱落,钢筋全 常生产,经多次到现场勘察,收集各种相关资料,并 部外露,压杆截面大大缩小,甚至个别腹杆截面缩 经过潜心研究试验,设计出1套“预应力桁架式脚 小后混凝土压酥,钢筋压屈,构件错位,证明屋架厂 手架”系列.该系列脚手架技术先进、科学,易于操房已存在严重安全隐惠,要求立即进行加固处理. 作、监控,安全系数大,解决了冶金工业厂房屋架在 该厂房为3跨冶炼车间,每跨跨度均为18m 柱 不停产的条...