型钢转换梁跨沉降后浇带施工技术.pdf

后浇带,学术文献
文档页数:4
文档大小:2.07MB
文档格式:pdf
文档分类:学术文献
上传会员:
上传日期:
最后更新:

2016年3月下 施工技术 第45卷第6期 CONSTRUCTION TECHNOLOGY 83 D01:10.7672/8gjs2016060083 型钢转换梁跨沉降后浇带施工技术 唐长领 (中铁建设集团有限公司,北京100040) [摘要]超高层施工中会遇到裙房与塔楼交界处型钢转换梁跨越沉降后浇带、同时型钢梁上有型钢转换柱的情况, 结合工程实例,详细阐述型钢转换梁跨沉降后浇带的施工方法,在保证结构沉降需要的同时,确保了施工安全质量 和进度. [关键词]梁;型钢转换梁;后浇带;施工技术 [中图分类号]TU375.1 [文献标识码]A [文章编号]1002-8498(2016)06-0083-04 Construction of Steel Reinforced Transfer Beam Crossing the Late Poured Band Tang Changling China Railway Construction Group Co.Ltd.Beijing 100040 China) Abstract:Because of the late poured band at the podium and tower intersection or the condition of steel reinforced transfer beam crossing steel reinforced transfer columns bining with the project examples the construction method of steel reinforced transfer beam crossing the late poured band is described in detail.The structure settlement requirement is guaranteed meanwhile the construction safe quality and program is ensured. Key words:beams;steel reinforced transfer beam;late poured band;construction 0引言 土强度等级为C35. 近年来超高层建筑发展迅速,建筑朝体型复2施工方案 杂、功能多样的综合性方向发展,因此,带转换层的2.1施工方法确定 超高层建筑因其具有底部大空间、使用灵活、方便 本工程原设计要求型钢梁(包含钢梁及钢筋) 等优点,在国内得到广泛应用.石家庄勒泰中心工 在沉降后浇带处断开,形成钢悬挑构件,相关钢结 程转换层位于地下1层,该部位有多处型钢转换梁 构、混凝土结构等必须待主楼结构封顶60d沉降完 跨越沉降后浇带的情况,施工中型钢梁后浇带处分 成后进行施工.原设计沉降后浇带处做法如图2所 节设小钢梁,采用临时螺栓固定、梁下加支撑钢柱 示,原设计后浇带宽1m 钢梁居中断开,沉降稳定后 的方案,确保施工安全和质量,大大提高施工进度. 焊接.由于沉降会导致钢梁错开,故整垮不能施工. 1工程概况 根据原设计钢梁在沉降后浇带中间断开,沉降 石家庄勒泰中心4号楼工程地下共4层,地上 稳定后钢梁可能错台严重,无法进行施工,因此只 31层,建筑高度134m 转换层位于地下1层,结构 能整跨型钢转换梁不施工.如沉降稳定后再施工, 形式为型钢混凝土框架结构.型钢混凝土结构梁 不仅造成占用大量周转材料和塔式起重机泵车等 截面尺寸为1000mm×120...

资源链接请先登录(扫码可直接登录、免注册)
十二年老网站,真实资源!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)