施工技术 2013年10月上 18 CONSTRUCTIONTECHNOLOGY 第42卷第19期 DOI:10. 7672/sgjs2013190018 武汉中心超深基坑坑中坑支护设计关键技术 许涛 (武汉大学土木建筑工程学院,湖北武汉430064) [摘要]以武汉中心基坑工程为例,介绍了武汉地区长江I级阶复杂地质条件下超深基坑坑中坑支护设计与降水 技术。
针对工程中存在的开挖深度深,降水难度大,地质条件及周边环境复杂等特点,采取了多种支护结构形式相 结合的支护措施与坑中坑降水技术,取得了良好的效果。
[关键词】地下工程;高层建筑;深基坑;支护;降水;设计 [中图分类号】TU753 【文献标识码】A 【文章编号〕1002-8498(2013)19-0018-04 The Key Design Technology of Pits in Ultra-deep Foundation Excavation inWuhan CenterProject Xu Tao (School of Civil Engineering,Wuhan University,Wuhan,Hubei 430064,China) Abstract:Based on Wuhan Center foundation excavation engineering, this paper introduced support design and dewatering technologies of pits in ultra-deep foundation excavation of Yangtze I-grade terrace. According to the characteristics as large excavation depth,dificult for dewatering and plicated geological conditions, support measures bined with multi-support structures and dewatering technology of pits in foundation excavation are adopted, and good effect is obtained. Key words;underground; tall buildings; deep foundation excavation; supports; dewatering; design 长江I级阶地具有典型的二元结构特征,主要则多边形,东侧约160m,西侧约230m,北侧约 由第四系全新统河流相及部分河湖相冲洪积及冲150m,南侧约80m,总开挖面积约28100m²,开挖土 湖积物构成,上部为黏性土,下部为砂性土(含卵砾 方近50万㎡”。
项目前期,业主为节约工期,在塔楼 石),为潜水~承压水含水层系统,以透水性弱、强 电梯井及集水井设计未完成时,要求先行按照裙 度低的黏性土组成相对隔水层或弱透水层,下部是 楼、主楼开挖标高进行基坑支护设计并施工,采取 以强度高、透水性强的砂、砾、卵石层为主的厚层状 SMW工法桩悬臂支挡、自然放坡、钻孔灌注悬臂排 承压含水层,与长江、汉水的水力联系密切,互补关 桩三级支护体系。
场区自然地面相对标高约 系、季节性变化规律明显。
长江I级阶地地质条件 -1.200m,塔楼区域大面积开挖深度为20.20m,非 下的基坑工程,随着开挖深度的增加,容易产生基 塔楼区域大面积开挖深度为18.50m。
后因电梯井 坑超限变形、基坑隆起、管涌、流砂、整体失稳以及 及集水井设计确定,开挖深度增加至26.70m,所以 引起周边环境的变形和破坏等不利影响,基坑的设 此坑中坑部分需要单独进行支护设计并实施。
计与施工过程中必须高度重视,采取必要措施加以 2工程与水文地质条件 控制。
2.1工程地质条件 1工程概况 本工程地貌上属于长江I级阶地,场地在勘探 武汉中心工程位于武汉市汉口王家墩中央商 深度72.60m范围内所分布的地层除表层分布有 务区核心地块,地下4层、地上88层,建筑高度 ①素填土(Q")外,其下为第四系全新统冲积成因 438m,总建筑面积353800m²。
该工程基坑呈不规 的黏性土和砂土(Q")和冲洪积成因的含圆砾细砂 (Q""),下伏基岩为志留系中统坟头组(S)泥岩、 【作者筒介】许涛,高级工程师,博士研究生,E-mail:xutao@ 泥质页岩。
【收稿日期]2013-05-28 根据岩土工程勘察报告,基坑开挖范围内土层 万方数据
许涛:武汉中心超深基坑坑中坑支护设计关键技术 19 2013 No.19 主要为素填土...