施工技术 2015年2月下 18 CONSTRUCTION TECHNOLOGY 第44卷第4期 D0I:10.7672/5js2015040018 武汉绿地中心工程临时支撑爆破拆除绿色施工技术 李航,唐碧波,凌兴文 (中建三局第二建设工程有限责任公司,湖北武汉430073) [摘要]以武汉绿地中心工程为例,详细介绍了爆破拆除地下室临时支撑的施工技术,施工过程中通过优化爆破网 路、搭设防护措施,控制噪声、扬尘、碎石飞溅等次生危害,取得了良好的效果,在后期的爆破废材处理方面,采取一 系列的有效措施,提高了废材回收利用率. [关键词]高层建筑:支撑;爆破;绿色施工;废材回收;防护 [中图分类号]TU753.6 [文献标识码]A [文章编号]1002-8498(2015)04-0018-03 Green Construction of Temporary Support Blasting Demolition in Wuhan Greenland Center Li Hang Tang Bibo Ling Xingwen The Second Construction Co.Ld.of China Construction Third Engineering Bureau Wuhan Hubei 430074 China) Abstract:Taking Wuhan Greenland Center project as an example authors introduce construction technology of temporary support blasting demolition of foundation excavation.During construction secondary damage of noise fugitive dust and spatter gravel is controlled by optimizing blasting network erecting protective measures.During the late treatment of blasting waste a series of effective measures are taken to improve the recovery utilization rate. Key words:tall buildings;supports;blast;green construction;waste materials recovery;protection 1工程概况 长江 武汉绿地中心工程周围环境复杂,西北方向距项 目部框架结构楼房15m 距项目部宿舍20m 距铁路 WN SXE 53m:西南方向临近武车一路;东南方向临近武车中 铁路 宿舍区域 路,距离对面高层框架楼房最近为53m 距变电箱及 配电箱9m;东北方向临近武车二路(见图1).地下 国 室施工临时支撑采用钢筋混凝土桁架式内支撑,主塔 楼区从上到下共设5道,总用量为14000m3(见图2) 武车中路 混凝土,副楼区共4道,总用量为17000m3混凝土. 武车一 0 住宅楼 武车二路 本文针对项目支撑拆除量大、周边环境复杂的特点, 路 阐述了支撑爆破拆除工艺和绿色施工关键技术. 和平大道 2技术特点 2.1施工效果好 图1周边环境示意 1)爆破拆除相对于机械拆除,噪声时间大幅缩 Fig.1 Schematic diagram of the 短,几乎可以忽略...
武汉绿地中心工程临时支撑爆破拆除绿色施工技术.pdf