2015年2月下 施工技术 第44卷第4期 CONSTRUCTION TECHNOLOGY 23 D0I:10.7672/sj52015040023 武汉绿地中心工程改进三重管法高压旋喷桩施工技术 黄晨光1,万阳1,王震2,程玉平2 (1.中建三局集团有限公司,湖北武汉430073;2.中建三局第二建设工程有限责任公司,湖北武汉430073) [摘要]根据常规高压旋喷桩的成桩原理及其影响因素,并结合武汉绿地中心工程的特殊性,对传统的三重管法进 行改进,提出了一种改进的三重管法高压旋喷桩施工技术,并在工程实践中成功应用. [关键词]高层建筑;地基;处理;高压旋喷桩;三重管法;施工技术 [中图分类号]TU753.3 [文献标识码]A[文章编号]1002-8498(2015)04-0023-03 Construction of an Improved Three Tube Jet Grouting Pile in Wuhan Greenland Center Huang Chenguang' Wan Yang' Wang Zhen㎡,Cheng Yuping2 (1.China Construction Third Engineering Bureau Co.Lad.Wuhan Hubei 430073 China: 2.The Second Construction Co.Ld.of China Construction Third Engineering Bureau Wuhan Hubei 430073 China) Abstract:According to pile-forming principles and influencing factors of normal high pressure jet grouting pile bining with the speciality of Wuhan Greenland Center project the traditional three pile method is improved.The construction technology of an improved three tube jet grouting pile was proposed.It was successful application in engineering practice and has a guiding significance to related projects. Key words:tall buildings;foundation;treatment;high pressure jet grouting pile;three tube method;construction 高压旋喷桩是一种软弱地基深层搅拌加固的砾中细砂为主,砂层极其厚,达到30多m 深层为砂 地基处理技术,具有加固土体高、加固质量均匀及 质泥岩或细砂岩(见图1). 加固形状可控等特点,已经被广泛应用于建筑基坑 工程和水电工程.周江平等讨论的高水力梯度下 15369 36 4 高压旋喷桩效果,提出了旋喷桩效果不理想的可能 04 性因素:巫昌斌等介绍了高压旋喷桩和槽壁地下连 3速 续墙加固的基坑围护施工技术;张帆介绍了两种先 进的高压喷射注浆工艺,比较了它们的优缺点. 1工程概况 0 武汉绿地中心项目主楼636m 基坑开挖面积为 露 36000m2 塔楼地下室基础底板面结构相对标高 风化国 -30.900m;基坑周...
推荐内容/By 图集吧
- 中国金茂市政管道工程施工参考管理指引.pdf
- 中建二局 施工现场临时水电布置操作手册.pdf
- 湖北省农村生活污水处理适用技术指南.pdf
- 人防工程平战结合水暖电维护管理手册.docx
- 2024版消防设计质量问题案例分析手册(水暖电建筑动力专业).pdf
- 中建建筑安装公司业务管理手册 下册.pdf
- 机械设计手册 第5卷 第6版 成大先.pdf
- 世茂集团售后维修指引(2020版).pdf
- 山东省建设工程质量检测机构资质现场专家评审工作指南.pdf
- 机电安装、钢结构工程现场标准化实施指引图册.pdf
- 中建商务副总管理能力培训课件(121页).pdf
- 中建项目商务管理手册(CSCECXJ-BM-2023).pdf