2011年5月上 施工技术 第40卷第340期 CONSTRUCTION TECHNOLOGY 73 溪洛渡水电站左岸进水口高边坡开挖爆破技术 张志高,施召云2 (1.北京北大资源地产有限公司,北京100084: 2.二滩术电开发有限贵任公司,四川成都610051) [接要]溪洛渡术电为世界第三大豆型水电,电站装机字量12600MW.左岸电站进术口区城谷随峻、地形 直杂,施工雅度大、技术求高,丹挖边高达170 按利开挖爆姓质量尤为要.根岸电站进水口丹挖爆破 施工特点皮施工要求,制定了和应的丹挖爆破展量标准,采取了一系列质量利施,使丹挖爆破质量得到了有 的控制,保证了开挖高边坡的穆定,又保证了开挖披面的展量. [关键询]俱洛流水电战:左岸:电战遵水:开拉爆破 [中图分类TV732 [立献标识]A [交章编号]1002-8498(2011)09-0073-02 Blasting Technology of High Slop Excavation in the Left Bank Station Inlet in Xiluodu Hydropower Station Zhang Zhigao' Shi Zhaoyun2 (1.Beijing Peking Resource Real Estate Co.Lad.Beijing 100084 China: 2.Ertan Hydropower Development Co.Ltd.Chengdu Sichuan 610051 China) Abstract:Xiluodu Hydropower Station is the third largest hydropower station in the world its installed capacity is 12 600MW.The inlet area of the left bank hydropower station has some characteristics of steep slope and plicated terrain which makes construction difficult and technique requirement high. The excavated slope is 170m in height so it is important for controlling blasting quality.Based on construction characteristies of exeavation and blasting in the inlet area the relative quality control standard on excavation and blasting is established.By adopting a series of quality controlling measures the excavation and blasting quality is controlled effectively from two aspects of stability of the high slope and the quality of the excavated slope surface. Key words:Xiluodu Hydropower Station:left bank:inlet:excavation and blasting ...
溪洛渡水电站左岸进水口高边坡开挖爆破技术.pdf