2014年5月下 施工技术 第43卷第10期 CONSTRUCTION TECHNOLOGY 85 D0I:10.7672/sgjs2014100085 长阳半岛工业化住宅预制构件安装工 (器)具应用效果分析 李永敢,李浩 (中建一局集团建设发展有限公司,北京100102) [摘要]北京长阳半岛工业化住宅工程采用装配整体式剪力墙结构,运用了预制外墙板、楼梯板、叠合板、阳台板、 飘窗及装饰板6类预制构件.通过对预制构件存放、构件吊装、安装辅助性工(器)具的应用情况进行阐述及分析, 得出工业化住宅预制构件施工工(器)具的应用使结构施工快捷、质量可靠,节约了安装时间,提高了劳动生产率. [关键词]工业化住宅;预制构件;安装;应用 [中图分类号]TU755.3 [文献标识码]A[文章编号]1002-8498(2014)10-0085-06 Analysis of Precast Component Installation Tools and Instruments Application Effect on Industrialized House of Changyang Peninsula Li Yonggan Li Hao China Construction First Division Group Construction Development Co.Lad.Beijing 100102 China) Abstract:Precast concrete shear wall structure is adopted in industrialized house of Beijing Changyang Peninsula and the precast outer wall stairs slabs laminated slab balcony slabs bay window slabs and decoration slabs are adopted too.Based on the application and analysis on the storage ponents and installation tools of the precast ponents the conclusion is put forward that the application of precast ponents installation tools has the advantages of simple construction saving installation time and improving construction speed. Key words:industrialized house;precast ponent;installation;applications 0引言 浇筑形成整体;预制装饰板随层安装、预制飘窗错 工业化住宅预制构件施工工(器)具应用情况层安装的方式完成结构施工.装配整体式剪力墙 是工业化施工技术发展程度的一个重要标志,也是结构施工工艺是从预制构件运至施工现场起,到构 体现住宅产业化发展水平的一个重要指标.工业件施工完毕时止的全过程,根据结构特点合理安排 化住宅装配式结构预制构件施工工(器)具的应用 施工工序,通过使用预制构件安装工(器)具在预制 经历了从无到有,从粗放笨重型向精致轻便型的发 构件存放、构件安装、构件连接等各环节进行控制, 展历程.专业安装工具的应用可以减轻...
推荐内容/By 图集吧
- DB37/T 5309-2024 住宅小区供热设施建设标准.pdf
- DB37/T 5061-2024 住宅小区供配电设施建设标准.pdf
- DB37/T 5308-2024 住宅小区燃气设施建设标准.pdf
- DB37/T 5307-2024 住宅小区供水设施建设标准.pdf
- 《装配式剪力墙住宅建筑设计规程》 配套图集 PT-970.pdf
- 《全国注册结构工程师专业考试试题新解》高层建筑结构.pdf
- 住宅小区394套精装房项目清单及图纸.zip
- 中建四局一公司《超高层建筑地下施工关键技术专题汇报》课件.pdf
- 中建四局华南公司《广州国际金融城AT090902地块项目超高层关键技术介绍》课件.pdf
- 中建四局《全钢结构超高层建造关键技术》课件.pdf
- 中建四局《超高层建筑顶模系统技术交流》课件.pdf
- 中建一局《超高层装配式住宅施工经验交流分享会》课件.pdf