Contents 1General provisions 2Terms and symbols ... 2.1 Terms (2) 2.2 Symbols (3) 3Materials (4) 4Architectural design (6) 4.1 General requirements (6) 4.2Building performance (7) 4.3Interior decoration,clectromechanical pipeline design (8) 5Structure design (9) 5.1 General requirements (9) 5.2 Component design (11) 5.3 Connection design (15) 5.4 Slab design (19) 6Precast ponentmanufacturing and transportation ...(21) 6.1General requirements‘ (21) 6.21 Rawmeterial and accessories (22) 6.3 Moulds (22) 6.4 Reforcement and embedded parts (24) 6.5 Forming,maintenance and demodeling (25) 6.6 Precast ponent testing (27) 6.7Precast ponent transportation (31) Construction (33) 3.
7.1 Generalrequirements (33) 7.2Storage,lifting and protection (34) 7.3Installation and connection (35) 8Quality acceptance (38) 8.1General regulations (38) 8.2Precast ponent acceptance (39) 8.3Reinforcesment embedded ponents acceptance (40) 8.4Post cast concrete acceptance ... (42) 8.5 Structural assembly construction acceptance (43) Explanation ofwording (45) List of quoted standards (46) Addition:Explanation ofprovisions (49)
1总则 1.0.1为规范密拼装配整体式剪力墙结构在工程中的应用,做到 安全适用、技术先进、经济合理、保证质量,制定本规程。
1.0.2本规程适用于抗震设防烈度8度及以下地区,采用密拼装 配整体式剪力墙结构技术的多、高层民用建筑的设计、生产、施工 及验收。
1.0.3密拼装配整体式剪力墙结构的设计、生产、施工及验收除 应符合本规程规定外,尚应符合国家现行有关标准和现行中国工 程建设标准化协会有关标准的规定。
2术语和符号 2.1术语 2.1.1密拼装配整体式剪力墙结构 monolithicprecastshear wallstructuresplicedbyclosedjoints 竖向构件采用密拼式接缝安装的凹槽墙板或夹心保温凹槽墙 板的装配整体式混凝土剪力墙结构。
2.1.2密拼式接缝 connectionwithoutgap 预制墙板安装时,相邻墙板之间不留间隙、采用密拼方式形成 的接缝。
2.1.3不出筋凹槽预制墙板 precast shearwallpanelwith grooves andwithout overhangreinforcements 纵向侧边不出筋并设有纵向凹槽,纵向凹槽内设有拉筋和托 筋、墙身带有插筋孔的预制混凝土墙板。
简称凹槽墙板。
2.1.4夹心保温凹槽墙板precast thermal insulation - posite shear wall panel with grooves and without overhang rein- forcements 由外叶墙板、夹心保温层、凹槽墙板组成的预制墙板。
...